Ares Management Corporation
Complete Site survey for 5 days, including all the MDFs and IDFs and complee network setup for the site with 300 users
Ares Management Case Study: Comprehensive Site Survey and Network Setup for 300 Users
Overview
Ares Management Corporation, a leading global alternative investment manager, engaged our IT services firm to conduct a comprehensive site survey and set up a robust network infrastructure for their new office location. With 300 employees expected to occupy the space, the project required meticulous planning and execution to ensure a seamless transition and optimal performance.
Objectives
- Complete a thorough site survey of the new office location, including all main distribution frames (MDFs) and intermediate distribution frames (IDFs).
- Design and implement a reliable network infrastructure capable of supporting 300 users.
- Ensure a smooth transition for employees to the new office with minimal downtime.
Methodology
- Site Survey: Our team spent 5 days conducting a detailed site survey, meticulously documenting the location of MDFs and IDFs, and assessing the existing infrastructure.
- Network Design: Based on the site survey findings and Ares Management’s requirements, our engineers designed a comprehensive network solution that included:
- Determining the optimal placement of network equipment
- Selecting high-performance hardware to handle the anticipated user load
- Configuring VLANs, subnets, and IP addressing schemes for efficient traffic management
- Implementation: Our skilled technicians worked diligently to implement the network design, ensuring minimal disruption to the office environment. Key tasks included:
- Installing and configuring network switches, routers, and firewalls
- Pulling and terminating network cables to connect workstations and other devices
- Configuring wireless access points for seamless connectivity
- Testing and validating the network’s performance and security
- User Migration: To ensure a smooth transition for employees, our team worked closely with Ares Management’s IT department to:
- Provide detailed user guides and training materials
- Offer on-site support during the migration process
- Respond promptly to any issues or concerns raised by employees
Results
Our comprehensive approach and dedication to excellence resulted in a successful project outcome:
- The site survey was completed within the allotted 5-day timeframe, providing valuable insights for the network design.
- The network infrastructure was set up and tested thoroughly, ensuring optimal performance and security for 300 users.
- The migration process was seamless, with minimal downtime and a high level of user satisfaction.
Conclusion
The Ares Management case study demonstrates our firm’s commitment to delivering high-quality IT services that meet the unique needs of our clients. By combining our technical expertise with a client-centric approach, we were able to successfully execute a complex project that involved a comprehensive site survey and network setup for 300 users. This case study serves as a testament to our ability to tackle challenging projects and deliver exceptional results.